Show Hamamatsu Avalanche Photo Diode 2609029892 - Archived data from Tue, 11. August 2020 17:37:04 CEST


This is all the information about APD 2609029892. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2609029892
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E15
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 380.5 V
Dark current: 8.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 72
Position in Box: 7
EP1 batch: 52
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.0540874 V     T = -25 °C: 344.6653036 V
Voltage for Gain 150: T = +20 °C: 387.8939803 V     T = -25 °C: 352.0304221 V
Voltage for Gain 200: T = +20 °C: 392.2562323 V     T = -25 °C: 356.1603667 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.5964752 V-1     T = -25 °C: 4.697610774 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.09039721 V-1     T = -25 °C: 9.481241029 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.1360765 V-1     T = -25 °C: 15.04262879 V-1
Break-through voltage: T = +20 °C: 406.4553603 V     T = -25 °C: 370.2521396 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:32 CET jreher Updated box and position via API.
03. Feb 2021 18:23:05 CET jreher Updated box and position via API.
03. Sep 2020 14:25:41 CEST jreher Assigned to capsule by script
11. Aug 2020 17:37:04 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:23:31 CET jreher Updated box and position via API.
27. Nov 2019 19:41:29 CET jreher Updated APD location via API.
25. Nov 2019 17:16:36 CET jreher Updated box and position via API.
06. Sep 2019 13:09:36 CEST spankonin Updated APD batch assignment via API.
02. Sep 2019 12:04:00 CEST markus.moritz
08. Jul 2019 14:53:52 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:50 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:10 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:30 CEST Tobias Imported from Hamamatsu datasheet.