RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2609029870 - Archived data from Fri, 05. February 2021 10:57:28 CET


This is all the information about APD 2609029870. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2609029870
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.4 V
Dark current: 12.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 71
Position in Box: 36
EP1 batch: 52
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.2148928 V     T = -25 °C: 343.9760005 V
Voltage for Gain 150: T = +20 °C: 387.1020362 V     T = -25 °C: 351.3838379 V
Voltage for Gain 200: T = +20 °C: 391.5316145 V     T = -25 °C: 355.5430362 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.519344641 V-1     T = -25 °C: 4.939228876 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.753835757 V-1     T = -25 °C: 9.050903065 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.207883 V-1     T = -25 °C: 16.08746429 V-1
Break-through voltage: T = +20 °C: 407.0671856 V     T = -25 °C: 370.7418422 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 09:59:51 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:00:13 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:57:28 CET jreher Updated box and position via API.
03. Feb 2021 18:23:01 CET jreher Updated box and position via API.
11. Aug 2020 17:37:00 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:20 CET jreher Updated APD location via API.
25. Nov 2019 17:16:32 CET jreher Updated box and position via API.
06. Sep 2019 13:09:01 CEST spankonin Updated APD batch assignment via API.
02. Sep 2019 11:35:45 CEST markus.moritz
08. Jul 2019 14:53:51 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:44 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:09 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:27 CEST Tobias Imported from Hamamatsu datasheet.