RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2609029845 - Archived data from Tue, 11. August 2020 17:36:56 CEST


This is all the information about APD 2609029845. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2609029845
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382 V
Dark current: 4.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 71
Position in Box: 14
EP1 batch: 51
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.5109961 V     T = -25 °C: 347.0367155 V
Voltage for Gain 150: T = +20 °C: 390.4105002 V     T = -25 °C: 354.473729 V
Voltage for Gain 200: T = +20 °C: 394.794965 V     T = -25 °C: 358.62937 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.420102394 V-1     T = -25 °C: 4.879135177 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.554267508 V-1     T = -25 °C: 8.998357608 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.84608436 V-1     T = -25 °C: 15.90859197 V-1
Break-through voltage: T = +20 °C: 408.9401588 V     T = -25 °C: 372.7748887 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:04:16 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:27:28 CET jreher Updated box and position via API.
05. Feb 2021 10:57:26 CET jreher Updated box and position via API.
03. Feb 2021 18:22:58 CET jreher Updated box and position via API.
11. Aug 2020 17:36:56 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:18 CET jreher Updated APD location via API.
25. Nov 2019 17:16:31 CET jreher Updated box and position via API.
06. Sep 2019 13:08:18 CEST spankonin Updated APD batch assignment via API.
02. Sep 2019 10:39:55 CEST markus.moritz
08. Jul 2019 14:53:35 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:43 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:08 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:22 CEST Tobias Imported from Hamamatsu datasheet.