RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2609029834 - Archived data from Mon, 17. May 2021 09:15:14 CEST


This is all the information about APD 2609029834. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2609029834
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.6 V
Dark current: 7.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 71
Position in Box: 3
EP1 batch: 50
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.7885158 V     T = -25 °C: 341.9194565 V
Voltage for Gain 150: T = +20 °C: 384.5445304 V     T = -25 °C: 349.156382 V
Voltage for Gain 200: T = +20 °C: 388.8710929 V     T = -25 °C: 353.2192473 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.793401854 V-1     T = -25 °C: 5.047732761 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.630232921 V-1     T = -25 °C: 9.517323297 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.93539293 V-1     T = -25 °C: 15.16872449 V-1
Break-through voltage: T = +20 °C: 404.1421155 V     T = -25 °C: 367.9516261 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 09:31:56 CET oafedulidis Assigned to capsule by script
17. May 2021 09:15:14 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:57:24 CET jreher Updated box and position via API.
03. Feb 2021 18:22:57 CET jreher Updated box and position via API.
11. Aug 2020 17:36:54 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:17 CET jreher Updated APD location via API.
25. Nov 2019 17:16:30 CET jreher Updated box and position via API.
06. Sep 2019 13:08:17 CEST spankonin Updated APD batch assignment via API.
02. Sep 2019 10:33:04 CEST markus.moritz
08. Jul 2019 14:53:21 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:42 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:08 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:19 CEST Tobias Imported from Hamamatsu datasheet.