RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2609029827 - Archived data from Tue, 11. August 2020 18:04:13 CEST


This is all the information about APD 2609029827. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2609029827
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Giessen, Box 70, Temp. in Box 286
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B04
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.3 V
Dark current: 5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 286
Position in Box: 26
EP1 batch: 103
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.093045 V     T = -25 °C: 342.1260682 V
Voltage for Gain 150: T = +20 °C: 384.9544159 V     T = -25 °C: 349.4742604 V
Voltage for Gain 200: T = +20 °C: 389.3496625 V     T = -25 °C: 353.6044219 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.559355464 V-1     T = -25 °C: 4.929027974 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.914975495 V-1     T = -25 °C: 9.066667983 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.78729808 V-1     T = -25 °C: 15.97527729 V-1
Break-through voltage: T = +20 °C: 405.4893495 V     T = -25 °C: 369.3698217 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:13 CET jreher Updated box and position via API.
06. Oct 2020 18:48:27 CEST jreher Updated APD location via API.
11. Aug 2020 18:04:13 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:39:57 CEST jreher Updated box and position via API.
10. Feb 2020 18:56:39 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 12:23:46 CET jreher Updated APD location via API.
25. Nov 2019 17:31:10 CET jreher Updated box and position via API.
25. Nov 2019 17:16:29 CET jreher Updated box and position via API.
22. Oct 2019 14:41:07 CEST spankonin Updated APD location via API.
22. Oct 2019 14:21:19 CEST jreher Updated APD batch assignment via API.
20. Aug 2019 14:02:54 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:45:37 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:08 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:16 CEST Tobias Imported from Hamamatsu datasheet.