RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2608029801 - Archived data from Tue, 06. October 2020 18:47:45 CEST


This is all the information about APD 2608029801. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2608029801
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D11
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 375.6 V
Dark current: 11.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 286
Position in Box: 22
EP1 batch: 103
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 375.6313619 V     T = -25 °C: 340.687769 V
Voltage for Gain 150: T = +20 °C: 383.4141018 V     T = -25 °C: 347.9462568 V
Voltage for Gain 200: T = +20 °C: 387.7465891 V     T = -25 °C: 352.0301353 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.385377075 V-1     T = -25 °C: 5.128657782 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.639327322 V-1     T = -25 °C: 9.668363777 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.99714566 V-1     T = -25 °C: 15.36541406 V-1
Break-through voltage: T = +20 °C: 404.5891507 V     T = -25 °C: 367.317519 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 13:13:07 CET oafedulidis Assigned to capsule by script
01. Dec 2021 12:57:22 CET oafedulidis Updated box and position via API.
05. Feb 2021 11:25:12 CET jreher Updated box and position via API.
06. Oct 2020 18:48:27 CEST jreher Updated APD location via API.
06. Oct 2020 18:47:45 CEST jreher Updated APD location via API.
11. Aug 2020 18:04:12 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:39:57 CEST jreher Updated box and position via API.
10. Feb 2020 18:56:38 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 12:23:46 CET jreher Updated APD location via API.
25. Nov 2019 17:31:10 CET jreher Updated box and position via API.
25. Nov 2019 17:16:28 CET jreher Updated box and position via API.
22. Oct 2019 14:41:07 CEST spankonin Updated APD location via API.
22. Oct 2019 14:21:19 CEST jreher Updated APD batch assignment via API.
20. Aug 2019 14:02:54 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:45:36 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:08 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:14 CEST Tobias Imported from Hamamatsu datasheet.