RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2608029799 - Archived data from Tue, 06. October 2020 18:48:27 CEST


This is all the information about APD 2608029799. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2608029799
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.4 V
Dark current: 8.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 286
Position in Box: 20
EP1 batch: 103
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.4079886 V     T = -25 °C: 345.0987052 V
Voltage for Gain 150: T = +20 °C: 388.2428825 V     T = -25 °C: 352.4933581 V
Voltage for Gain 200: T = +20 °C: 392.5951832 V     T = -25 °C: 356.626613 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.459855029 V-1     T = -25 °C: 4.844445185 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.709360987 V-1     T = -25 °C: 9.937756616 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.08222678 V-1     T = -25 °C: 15.72603221 V-1
Break-through voltage: T = +20 °C: 407.8332322 V     T = -25 °C: 371.7715008 V
   
Notes:


Version history

Time Author Change comment
27. Jun 2022 12:44:26 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:02:19 CEST jreher Updated box and position via API.
05. Feb 2021 11:25:12 CET jreher Updated box and position via API.
06. Oct 2020 18:48:27 CEST jreher Updated APD location via API.
11. Aug 2020 18:04:12 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:39:57 CEST jreher Updated box and position via API.
10. Feb 2020 18:56:38 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 12:23:46 CET jreher Updated APD location via API.
25. Nov 2019 17:31:09 CET jreher Updated box and position via API.
25. Nov 2019 17:16:28 CET jreher Updated box and position via API.
22. Oct 2019 14:41:07 CEST spankonin Updated APD location via API.
22. Oct 2019 14:21:19 CEST jreher Updated APD batch assignment via API.
20. Aug 2019 14:02:54 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:45:36 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:07 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:14 CEST Tobias Imported from Hamamatsu datasheet.