RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2608029791 - Archived data from Tue, 11. August 2020 18:04:10 CEST


This is all the information about APD 2608029791. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2608029791
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Giessen, Box 70, Temp. in Box 286
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E09
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 375.6 V
Dark current: 16.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 286
Position in Box: 12
EP1 batch: 103
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 375.3725365 V     T = -25 °C: 340.4896148 V
Voltage for Gain 150: T = +20 °C: 383.1540854 V     T = -25 °C: 347.7387805 V
Voltage for Gain 200: T = +20 °C: 387.5190518 V     T = -25 °C: 351.8026595 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.539597132 V-1     T = -25 °C: 4.837795046 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.868263139 V-1     T = -25 °C: 9.92340893 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.64059011 V-1     T = -25 °C: 16.06778626 V-1
Break-through voltage: T = +20 °C: 403.2602957 V     T = -25 °C: 366.9770638 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:11 CET jreher Updated box and position via API.
06. Oct 2020 18:48:26 CEST jreher Updated APD location via API.
06. Oct 2020 18:47:42 CEST jreher Updated APD location via API.
11. Aug 2020 18:04:10 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:39:56 CEST jreher Updated box and position via API.
10. Feb 2020 18:56:38 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 12:23:45 CET jreher Updated APD location via API.
25. Nov 2019 17:31:09 CET jreher Updated box and position via API.
25. Nov 2019 17:16:27 CET jreher Updated box and position via API.
22. Oct 2019 14:41:06 CEST spankonin Updated APD location via API.
22. Oct 2019 14:21:18 CEST jreher Updated APD batch assignment via API.
20. Aug 2019 14:02:53 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:45:35 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:07 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:11 CEST Tobias Imported from Hamamatsu datasheet.