RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2608029788 - Archived data from Tue, 06. October 2020 18:48:26 CEST


This is all the information about APD 2608029788. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2608029788
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G10
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 376.2 V
Dark current: 13.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 286
Position in Box: 9
EP1 batch: 103
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 375.8807284 V     T = -25 °C: 340.8121358 V
Voltage for Gain 150: T = +20 °C: 383.5490431 V     T = -25 °C: 348.163404 V
Voltage for Gain 200: T = +20 °C: 387.8807589 V     T = -25 °C: 352.339279 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.379422787 V-1     T = -25 °C: 5.038267644 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.824239062 V-1     T = -25 °C: 9.143281896 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.7573198 V-1     T = -25 °C: 14.47999876 V-1
Break-through voltage: T = +20 °C: 403.2901699 V     T = -25 °C: 367.1304476 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:11 CET jreher Updated box and position via API.
06. Oct 2020 18:48:26 CEST jreher Updated APD location via API.
11. Aug 2020 18:04:09 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:39:56 CEST jreher Updated box and position via API.
10. Feb 2020 18:56:37 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 12:23:45 CET jreher Updated APD location via API.
25. Nov 2019 17:31:09 CET jreher Updated box and position via API.
25. Nov 2019 17:16:27 CET jreher Updated box and position via API.
22. Oct 2019 14:41:06 CEST spankonin Updated APD location via API.
22. Oct 2019 14:21:18 CEST jreher Updated APD batch assignment via API.
20. Aug 2019 14:02:53 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:45:35 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:07 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:10 CEST Tobias Imported from Hamamatsu datasheet.