RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2608029787 - Archived data from Tue, 06. October 2020 18:47:55 CEST


This is all the information about APD 2608029787. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2608029787
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H09
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 378.1 V
Dark current: 8.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 286
Position in Box: 8
EP1 batch: 103
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.8516887 V     T = -25 °C: 343.0771118 V
Voltage for Gain 150: T = +20 °C: 385.695768 V     T = -25 °C: 350.4638953 V
Voltage for Gain 200: T = +20 °C: 390.0749121 V     T = -25 °C: 354.6046932 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.660585244 V-1     T = -25 °C: 4.900516709 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.194975022 V-1     T = -25 °C: 9.008733769 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.28808825 V-1     T = -25 °C: 15.98172518 V-1
Break-through voltage: T = +20 °C: 403.8348288 V     T = -25 °C: 369.9014349 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:11 CET jreher Updated box and position via API.
06. Oct 2020 18:48:26 CEST jreher Updated APD location via API.
06. Oct 2020 18:47:55 CEST jreher Updated APD location via API.
11. Aug 2020 18:04:09 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:39:56 CEST jreher Updated box and position via API.
10. Feb 2020 18:57:11 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 12:23:45 CET jreher Updated APD location via API.
25. Nov 2019 17:31:09 CET jreher Updated box and position via API.
25. Nov 2019 17:16:27 CET jreher Updated box and position via API.
22. Oct 2019 14:41:06 CEST spankonin Updated APD location via API.
22. Oct 2019 14:21:18 CEST jreher Updated APD batch assignment via API.
20. Aug 2019 14:02:53 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:45:35 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:07 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:10 CEST Tobias Imported from Hamamatsu datasheet.