RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0802007302 - Archived data from Wed, 03. February 2021 18:20:52 CET


This is all the information about APD 0802007302. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0802007302
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A07
Break-through voltage: 420 V
Voltage for Gain 100 (T=+25°C): 391.3 V
Dark current: 3.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 54
Position in Box: 14
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 04. Jun 2019
Return for assembly: none
   
Irradiation:  
Date: 29. May 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 29. May 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 391.8393349 V     T = -25 °C: 355.4341563 V
Voltage for Gain 150: T = +20 °C: 399.7568948 V     T = -25 °C: 363.133286 V
Voltage for Gain 200: T = +20 °C: 404.1536595 V     T = -25 °C: 367.4675733 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.476380346 V-1     T = -25 °C: 4.745293196 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.562671327 V-1     T = -25 °C: 9.276640504 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.39781231 V-1     T = -25 °C: 14.03799961 V-1
Break-through voltage: T = +20 °C: 419.4088771 V     T = -25 °C: 383.1743567 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:55:17 CET jreher Updated box and position via API.
03. Feb 2021 18:20:52 CET jreher Updated box and position via API.
11. Aug 2020 17:27:48 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:38:15 CET jreher Updated APD location via API.
25. Nov 2019 17:15:09 CET jreher Updated box and position via API.
04. Jul 2019 11:12:34 CEST jreher Updated APD location via API.
18. Jun 2019 13:26:31 CEST jgrochowski Updated APD batch assignment via API.
04. Jun 2019 13:42:15 CEST markus.moritz
22. Jun 2016 15:22:33 CEST Tobias Imported from Hamamatsu datasheet.