RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2608029751 - Archived data from Wed, 07. October 2020 12:11:11 CEST


This is all the information about APD 2608029751. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2608029751
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2413026950/2608029751
Unit: #1330 (barcode 1309014804)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: G04
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 381.8 V
Dark current: 8.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 69
Position in Box: 41
EP1 batch: 50
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.9871482 V     T = -25 °C: 345.9286258 V
Voltage for Gain 150: T = +20 °C: 388.8657652 V     T = -25 °C: 353.3398895 V
Voltage for Gain 200: T = +20 °C: 393.2450741 V     T = -25 °C: 357.5068694 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.609535839 V-1     T = -25 °C: 4.932504287 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.101345152 V-1     T = -25 °C: 9.171083196 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.1949215 V-1     T = -25 °C: 16.28305762 V-1
Break-through voltage: T = +20 °C: 407.4819409 V     T = -25 °C: 372.208571 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:17 CET jreher Updated box and position via API.
03. Feb 2021 18:22:49 CET jreher Updated box and position via API.
07. Oct 2020 12:11:11 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:46 CEST jreher Updated box and position via API.
11. Aug 2020 17:39:48 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:02 CET jreher Updated APD location via API.
25. Nov 2019 17:16:23 CET jreher Updated box and position via API.
17. Sep 2019 11:30:59 CEST jgrochowski Updated APD batch assignment via API.
03. Sep 2019 15:15:49 CEST markus.moritz
08. Jul 2019 14:53:20 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:30 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:06 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:52 CEST Tobias Imported from Hamamatsu datasheet.