RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2608029745 - Archived data from Tue, 08. December 2020 17:17:58 CET


This is all the information about APD 2608029745. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2608029745
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2608029745/0710006205
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E03
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.7 V
Dark current: 9.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 69
Position in Box: 36
EP1 batch: 50
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.9518149 V     T = -25 °C: 347.4253208 V
Voltage for Gain 150: T = +20 °C: 390.7826899 V     T = -25 °C: 354.832418 V
Voltage for Gain 200: T = +20 °C: 395.1319562 V     T = -25 °C: 358.9820114 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.641510739 V-1     T = -25 °C: 4.777915285 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.232705264 V-1     T = -25 °C: 9.653048273 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.47177579 V-1     T = -25 °C: 15.35741418 V-1
Break-through voltage: T = +20 °C: 410.5261604 V     T = -25 °C: 374.3398132 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:16 CET jreher Updated box and position via API.
03. Feb 2021 18:22:48 CET jreher Updated box and position via API.
08. Dec 2020 17:17:58 CET jreher Assigned to capsule by script
06. Oct 2020 16:53:08 CEST jreher Updated box and position via API.
11. Aug 2020 17:39:47 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:01 CET jreher Updated APD location via API.
25. Nov 2019 17:16:23 CET jreher Updated box and position via API.
17. Sep 2019 11:30:59 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:34:56 CEST markus.moritz
08. Jul 2019 14:53:20 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:29 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:06 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:50 CEST Tobias Imported from Hamamatsu datasheet.