RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2608029744 - Archived data from Tue, 11. August 2020 17:39:47 CEST


This is all the information about APD 2608029744. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2608029744
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B12
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 377 V
Dark current: 6.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 215
Position in Box: 43
EP1 batch: 50
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.2369901 V     T = -25 °C: 342.3345023 V
Voltage for Gain 150: T = +20 °C: 385.0199662 V     T = -25 °C: 349.6392679 V
Voltage for Gain 200: T = +20 °C: 389.3697344 V     T = -25 °C: 353.7194408 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.606689986 V-1     T = -25 °C: 4.855655425 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.066196855 V-1     T = -25 °C: 10.06418593 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.07552023 V-1     T = -25 °C: 16.19313284 V-1
Break-through voltage: T = +20 °C: 404.7759171 V     T = -25 °C: 368.7854607 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:24:30 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:57:16 CET jreher Updated box and position via API.
03. Feb 2021 18:22:48 CET jreher Updated box and position via API.
11. Aug 2020 17:39:47 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:01 CET jreher Updated APD location via API.
25. Nov 2019 17:16:23 CET jreher Updated box and position via API.
17. Sep 2019 11:30:59 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:34:20 CEST markus.moritz
08. Jul 2019 14:53:20 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:29 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:06 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:50 CEST Tobias Imported from Hamamatsu datasheet.