RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2608029741 - Archived data from Mon, 17. August 2020 15:53:19 CEST


This is all the information about APD 2608029741. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2608029741
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C02
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.8 V
Dark current: 7.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 69
Position in Box: 32
EP1 batch: 50
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.5261392 V     T = -25 °C: 346.3881752 V
Voltage for Gain 150: T = +20 °C: 389.4137543 V     T = -25 °C: 353.7914157 V
Voltage for Gain 200: T = +20 °C: 393.8105939 V     T = -25 °C: 357.9376923 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.437499501 V-1     T = -25 °C: 4.783650835 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.656875988 V-1     T = -25 °C: 9.803687557 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.09488443 V-1     T = -25 °C: 15.62335053 V-1
Break-through voltage: T = +20 °C: 409.2404883 V     T = -25 °C: 373.6457132 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:16 CET jreher Updated box and position via API.
03. Feb 2021 18:22:48 CET jreher Updated box and position via API.
07. Oct 2020 12:09:37 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:19 CEST jreher Updated box and position via API.
11. Aug 2020 17:39:46 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:01 CET jreher Updated APD location via API.
25. Nov 2019 17:16:22 CET jreher Updated box and position via API.
17. Sep 2019 11:30:58 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:32:00 CEST markus.moritz
08. Jul 2019 14:53:19 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:29 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:06 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:49 CEST Tobias Imported from Hamamatsu datasheet.