RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2520029117 - Archived data from Fri, 05. February 2021 10:57:15 CET


This is all the information about APD 2520029117. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2520029117
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D01
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382.9 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 215
Position in Box: 40
EP1 batch: 49
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.2763925 V     T = -25 °C: 346.9606652 V
Voltage for Gain 150: T = +20 °C: 390.1513478 V     T = -25 °C: 354.3877895 V
Voltage for Gain 200: T = +20 °C: 394.5430247 V     T = -25 °C: 358.5555895 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.509414922 V-1     T = -25 °C: 4.909244217 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.782153883 V-1     T = -25 °C: 9.046577693 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.30714522 V-1     T = -25 °C: 16.08936436 V-1
Break-through voltage: T = +20 °C: 408.9973122 V     T = -25 °C: 373.1288372 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:24:30 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:57:15 CET jreher Updated box and position via API.
03. Feb 2021 18:22:47 CET jreher Updated box and position via API.
11. Aug 2020 17:39:45 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:00 CET jreher Updated APD location via API.
25. Nov 2019 17:16:22 CET jreher Updated box and position via API.
13. Sep 2019 10:31:36 CEST jgrochowski Updated APD batch assignment via API.
29. Jul 2019 14:43:01 CEST markus.moritz
08. Jul 2019 14:53:06 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:28 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:05 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:45 CEST Tobias Imported from Hamamatsu datasheet.