RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2520029112 - Archived data from Tue, 08. December 2020 17:10:59 CET


This is all the information about APD 2520029112. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2520029112
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2406026364/2520029112
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C11
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.4 V
Dark current: 4.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 69
Position in Box: 19
EP1 batch: 49
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.6110268 V     T = -25 °C: 344.2046 V
Voltage for Gain 150: T = +20 °C: 387.4044264 V     T = -25 °C: 351.5790144 V
Voltage for Gain 200: T = +20 °C: 391.7552729 V     T = -25 °C: 355.726899 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.413181771 V-1     T = -25 °C: 4.843116256 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.591973876 V-1     T = -25 °C: 9.84144722 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.81650008 V-1     T = -25 °C: 15.56410828 V-1
Break-through voltage: T = +20 °C: 407.261381 V     T = -25 °C: 371.0305713 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:14 CET jreher Updated box and position via API.
03. Feb 2021 18:22:47 CET jreher Updated box and position via API.
08. Dec 2020 17:10:59 CET jreher Assigned to capsule by script
06. Oct 2020 16:51:51 CEST jreher Updated box and position via API.
11. Aug 2020 17:39:44 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:00 CET jreher Updated APD location via API.
25. Nov 2019 17:16:21 CET jreher Updated box and position via API.
13. Sep 2019 10:31:36 CEST jgrochowski Updated APD batch assignment via API.
29. Jul 2019 14:41:35 CEST markus.moritz
08. Jul 2019 14:53:06 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:28 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:05 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:43 CEST Tobias Imported from Hamamatsu datasheet.