RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2520029111 - Archived data from Fri, 05. February 2021 10:57:14 CET


This is all the information about APD 2520029111. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2520029111
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377 V
Dark current: 5.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 215
Position in Box: 38
EP1 batch: 49
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.7360752 V     T = -25 °C: 341.7505289 V
Voltage for Gain 150: T = +20 °C: 384.5459656 V     T = -25 °C: 349.0588828 V
Voltage for Gain 200: T = +20 °C: 388.8939015 V     T = -25 °C: 353.1695312 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.735079561 V-1     T = -25 °C: 5.057110884 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.554715041 V-1     T = -25 °C: 9.55091311 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.80072888 V-1     T = -25 °C: 15.10976715 V-1
Break-through voltage: T = +20 °C: 404.9747828 V     T = -25 °C: 368.6864711 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:24:30 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:57:14 CET jreher Updated box and position via API.
03. Feb 2021 18:22:47 CET jreher Updated box and position via API.
11. Aug 2020 17:39:44 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:00 CET jreher Updated APD location via API.
25. Nov 2019 17:16:21 CET jreher Updated box and position via API.
13. Sep 2019 10:31:36 CEST jgrochowski Updated APD batch assignment via API.
29. Jul 2019 14:38:53 CEST markus.moritz
08. Jul 2019 14:53:05 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:28 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:05 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:42 CEST Tobias Imported from Hamamatsu datasheet.