RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2520029103 - Archived data from Wed, 03. February 2021 18:22:46 CET


This is all the information about APD 2520029103. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2520029103
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2520029103/2317025555
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: B09
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.1 V
Dark current: 4.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 69
Position in Box: 10
EP1 batch: 49
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.4727158 V     T = -25 °C: 345.1623225 V
Voltage for Gain 150: T = +20 °C: 388.302533 V     T = -25 °C: 352.5662129 V
Voltage for Gain 200: T = +20 °C: 392.6593693 V     T = -25 °C: 356.6949934 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.456767758 V-1     T = -25 °C: 4.845127412 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.695454427 V-1     T = -25 °C: 9.926608732 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.18483103 V-1     T = -25 °C: 15.86613263 V-1
Break-through voltage: T = +20 °C: 407.5858363 V     T = -25 °C: 371.436139 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:13 CET jreher Updated box and position via API.
03. Feb 2021 18:22:46 CET jreher Updated box and position via API.
07. Oct 2020 12:12:55 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:27 CEST jreher Updated box and position via API.
11. Aug 2020 17:39:42 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:59 CET jreher Updated APD location via API.
25. Nov 2019 17:16:21 CET jreher Updated box and position via API.
13. Sep 2019 10:31:35 CEST jgrochowski Updated APD batch assignment via API.
29. Jul 2019 14:35:07 CEST markus.moritz
08. Jul 2019 14:53:05 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:27 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:05 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:40 CEST Tobias Imported from Hamamatsu datasheet.