RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2520029095 - Archived data from Tue, 16. February 2021 12:26:10 CET


This is all the information about APD 2520029095. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2520029095
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A08
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 69
Position in Box: 2
EP1 batch: 49
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.0145111 V     T = -25 °C: 347.4147428 V
Voltage for Gain 150: T = +20 °C: 390.9017479 V     T = -25 °C: 354.8672176 V
Voltage for Gain 200: T = +20 °C: 395.2877217 V     T = -25 °C: 359.0642691 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.564713955 V-1     T = -25 °C: 4.713785387 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.004354818 V-1     T = -25 °C: 9.506620024 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.96963473 V-1     T = -25 °C: 14.96520334 V-1
Break-through voltage: T = +20 °C: 410.6119262 V     T = -25 °C: 374.6707782 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:04:38 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:26:10 CET jreher Updated box and position via API.
05. Feb 2021 10:57:12 CET jreher Updated box and position via API.
03. Feb 2021 18:22:45 CET jreher Updated box and position via API.
11. Aug 2020 17:39:41 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:59 CET jreher Updated APD location via API.
25. Nov 2019 17:16:20 CET jreher Updated box and position via API.
13. Sep 2019 10:31:35 CEST jgrochowski Updated APD batch assignment via API.
29. Jul 2019 14:24:59 CEST markus.moritz
08. Jul 2019 14:53:04 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:27 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:04 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:37 CEST Tobias Imported from Hamamatsu datasheet.