RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2520029089 - Archived data from Mon, 15. February 2021 15:40:02 CET


This is all the information about APD 2520029089. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2520029089
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 3008033742/2520029089
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.4 V
Dark current: 5.1 nA
   
Screening Logistics:  
Available: No
Storage Box: 68
Position in Box: 46
EP1 batch: 49
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.1830716 V     T = -25 °C: 347.7031958 V
Voltage for Gain 150: T = +20 °C: 391.0624776 V     T = -25 °C: 355.1171446 V
Voltage for Gain 200: T = +20 °C: 395.4509503 V     T = -25 °C: 359.3045541 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.52024585 V-1     T = -25 °C: 4.628649237 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.885134412 V-1     T = -25 °C: 9.297852997 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.52159738 V-1     T = -25 °C: 14.61108581 V-1
Break-through voltage: T = +20 °C: 411.4209348 V     T = -25 °C: 375.0887375 V
   
Notes:


Version history

Time Author Change comment
16. Feb 2021 12:25:41 CET jreher Updated box and position via API.
15. Feb 2021 15:40:02 CET jreher Assigned to capsule by script
05. Feb 2021 10:57:10 CET jreher Updated box and position via API.
03. Feb 2021 18:22:42 CET jreher Updated box and position via API.
11. Aug 2020 17:33:46 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:51 CET jreher Updated APD location via API.
25. Nov 2019 17:16:19 CET jreher Updated box and position via API.
05. Aug 2019 16:55:02 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 14:22:40 CEST markus.moritz
08. Jul 2019 14:53:04 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:22 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:04 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:35 CEST Tobias Imported from Hamamatsu datasheet.