RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2520029085 - Archived data from Mon, 17. August 2020 15:51:10 CEST


This is all the information about APD 2520029085. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2520029085
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E03
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.1 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 68
Position in Box: 42
EP1 batch: 48
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.0066532 V     T = -25 °C: 346.6642817 V
Voltage for Gain 150: T = +20 °C: 389.9015657 V     T = -25 °C: 354.0282061 V
Voltage for Gain 200: T = +20 °C: 394.2920727 V     T = -25 °C: 358.1914379 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.576716356 V-1     T = -25 °C: 4.699842685 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.990033081 V-1     T = -25 °C: 9.387948525 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.94465411 V-1     T = -25 °C: 14.80191705 V-1
Break-through voltage: T = +20 °C: 409.9238062 V     T = -25 °C: 373.6310215 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:09 CET jreher Updated box and position via API.
03. Feb 2021 18:22:42 CET jreher Updated box and position via API.
07. Oct 2020 16:40:32 CEST jreher Assigned to capsule by script
17. Aug 2020 15:51:10 CEST jreher Updated box and position via API.
11. Aug 2020 17:33:45 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:35:30 CET jreher Updated box and position via API.
27. Nov 2019 19:40:51 CET jreher Updated APD location via API.
25. Nov 2019 17:16:18 CET jreher Updated box and position via API.
05. Aug 2019 16:55:01 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 14:21:05 CEST markus.moritz
08. Jul 2019 14:52:14 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:22 CEST jreher Updated APD location via API.
01. Jul 2019 12:41:24 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:13:04 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:34 CEST Tobias Imported from Hamamatsu datasheet.