RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2520029083 - Archived data from Wed, 03. February 2021 18:22:42 CET


This is all the information about APD 2520029083. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2520029083
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2520029083/2302024297
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.4 V
Dark current: 5.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 68
Position in Box: 40
EP1 batch: 48
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.1358131 V     T = -25 °C: 345.8864088 V
Voltage for Gain 150: T = +20 °C: 389.0739314 V     T = -25 °C: 353.2182783 V
Voltage for Gain 200: T = +20 °C: 393.4885187 V     T = -25 °C: 357.3828545 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.459184496 V-1     T = -25 °C: 4.975149557 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.70342681 V-1     T = -25 °C: 9.228902879 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.0134152 V-1     T = -25 °C: 16.24739355 V-1
Break-through voltage: T = +20 °C: 409.4889272 V     T = -25 °C: 372.9909252 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:09 CET jreher Updated box and position via API.
03. Feb 2021 18:22:42 CET jreher Updated box and position via API.
07. Oct 2020 12:09:42 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:20 CEST jreher Updated box and position via API.
11. Aug 2020 17:33:44 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:50 CET jreher Updated APD location via API.
25. Nov 2019 17:16:18 CET jreher Updated box and position via API.
05. Aug 2019 16:55:01 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 14:20:17 CEST markus.moritz
08. Jul 2019 14:52:14 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:22 CEST jreher Updated APD location via API.
01. Jul 2019 12:41:24 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:13:04 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:32 CEST Tobias Imported from Hamamatsu datasheet.