RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2520029082 - Archived data from Wed, 03. February 2021 18:22:42 CET


This is all the information about APD 2520029082. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2520029082
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B13
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.8 V
Dark current: 3.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 68
Position in Box: 39
EP1 batch: 48
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.4435318 V     T = -25 °C: 345.0578988 V
Voltage for Gain 150: T = +20 °C: 388.3628237 V     T = -25 °C: 352.5064703 V
Voltage for Gain 200: T = +20 °C: 392.7653887 V     T = -25 °C: 356.6803418 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.418769199 V-1     T = -25 °C: 4.862496607 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.51144686 V-1     T = -25 °C: 9.839032879 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.67094599 V-1     T = -25 °C: 15.60825785 V-1
Break-through voltage: T = +20 °C: 407.4771869 V     T = -25 °C: 372.4571752 V
   
Notes:


Version history

Time Author Change comment
14. Apr 2021 16:34:19 CEST jreher Updated box and position via API.
05. Feb 2021 10:57:09 CET jreher Updated box and position via API.
03. Feb 2021 18:22:42 CET jreher Updated box and position via API.
11. Aug 2020 17:33:44 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:50 CET jreher Updated APD location via API.
25. Nov 2019 17:16:18 CET jreher Updated box and position via API.
05. Aug 2019 16:55:01 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 14:19:50 CEST markus.moritz
08. Jul 2019 14:52:14 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:22 CEST jreher Updated APD location via API.
01. Jul 2019 12:41:24 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:13:04 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:31 CEST Tobias Imported from Hamamatsu datasheet.