RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2520029080 - Archived data from Tue, 11. August 2020 17:33:44 CEST


This is all the information about APD 2520029080. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2520029080
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C03
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.3 V
Dark current: 5.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 68
Position in Box: 37
EP1 batch: 48
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 16. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.3760077 V     T = -25 °C: 347.7784632 V
Voltage for Gain 150: T = +20 °C: 391.259463 V     T = -25 °C: 355.2386415 V
Voltage for Gain 200: T = +20 °C: 395.6392987 V     T = -25 °C: 359.4237596 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.43773905 V-1     T = -25 °C: 4.938609746 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.667484174 V-1     T = -25 °C: 9.098977072 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.99883496 V-1     T = -25 °C: 16.1995356 V-1
Break-through voltage: T = +20 °C: 411.2201042 V     T = -25 °C: 374.9522586 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:09 CET jreher Updated box and position via API.
03. Feb 2021 18:22:41 CET jreher Updated box and position via API.
11. Aug 2020 17:33:44 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:50 CET jreher Updated APD location via API.
25. Nov 2019 17:16:18 CET jreher Updated box and position via API.
05. Aug 2019 16:55:01 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 14:19:12 CEST markus.moritz
08. Jul 2019 14:52:14 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:21 CEST jreher Updated APD location via API.
01. Jul 2019 12:41:24 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:13:04 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:31 CEST Tobias Imported from Hamamatsu datasheet.