Show Hamamatsu Avalanche Photo Diode 2520029068 - Archived data from Wed, 07. October 2020 12:26:26 CEST


This is all the information about APD 2520029068. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2520029068
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2414027068/2520029068
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.9 V
Dark current: 5.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 68
Position in Box: 25
EP1 batch: 48
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.1236261 V     T = -25 °C: 343.7285992 V
Voltage for Gain 150: T = +20 °C: 386.9003974 V     T = -25 °C: 351.046853 V
Voltage for Gain 200: T = +20 °C: 391.2380597 V     T = -25 °C: 355.1590106 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.64607562 V-1     T = -25 °C: 9.950065662 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.157403748 V-1     T = -25 °C: 9.553517296 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.27073013 V-1     T = -25 °C: 15.17871034 V-1
Break-through voltage: T = +20 °C: 407.0581362 V     T = -25 °C: 370.3139069 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:07 CET jreher Updated box and position via API.
03. Feb 2021 18:22:40 CET jreher Updated box and position via API.
07. Oct 2020 12:26:26 CEST jreher Assigned to capsule by script
17. Aug 2020 15:50:35 CEST jreher Updated box and position via API.
11. Aug 2020 17:33:42 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:34:54 CET jreher Updated box and position via API.
27. Nov 2019 19:40:49 CET jreher Updated APD location via API.
25. Nov 2019 17:16:17 CET jreher Updated box and position via API.
05. Aug 2019 16:55:00 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 14:01:35 CEST markus.moritz
08. Jul 2019 14:52:13 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:20 CEST jreher Updated APD location via API.
01. Jul 2019 12:41:23 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:13:03 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:27 CEST Tobias Imported from Hamamatsu datasheet.