RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2520029066 - Archived data from Tue, 11. August 2020 17:33:41 CEST


This is all the information about APD 2520029066. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2520029066
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B04
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.9 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 68
Position in Box: 23
EP1 batch: 48
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.5889332 V     T = -25 °C: 347.7727546 V
Voltage for Gain 150: T = +20 °C: 390.465551 V     T = -25 °C: 355.3805669 V
Voltage for Gain 200: T = +20 °C: 394.8398451 V     T = -25 °C: 359.6542278 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.375575279 V-1     T = -25 °C: 4.854781729 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.482157718 V-1     T = -25 °C: 8.83926217 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.62846077 V-1     T = -25 °C: 15.29531865 V-1
Break-through voltage: T = +20 °C: 409.4948108 V     T = -25 °C: 373.9246547 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:07 CET jreher Updated box and position via API.
03. Feb 2021 18:22:40 CET jreher Updated box and position via API.
11. Aug 2020 17:33:41 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:49 CET jreher Updated APD location via API.
25. Nov 2019 17:16:17 CET jreher Updated box and position via API.
05. Aug 2019 16:55:00 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 14:00:33 CEST markus.moritz
08. Jul 2019 14:52:13 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:20 CEST jreher Updated APD location via API.
01. Jul 2019 12:41:22 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:13:03 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:27 CEST Tobias Imported from Hamamatsu datasheet.