RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2520029065 - Archived data from Wed, 07. October 2020 12:11:09 CEST


This is all the information about APD 2520029065. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2520029065
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2520029065/0813008176
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: H07
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379.8 V
Dark current: 9.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 68
Position in Box: 22
EP1 batch: 48
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.4942913 V     T = -25 °C: 344.2948623 V
Voltage for Gain 150: T = +20 °C: 387.3854366 V     T = -25 °C: 351.7103508 V
Voltage for Gain 200: T = +20 °C: 391.7891307 V     T = -25 °C: 355.8680773 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.423204024 V-1     T = -25 °C: 4.814017767 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.55543818 V-1     T = -25 °C: 9.72936466 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.72684594 V-1     T = -25 °C: 15.41876071 V-1
Break-through voltage: T = +20 °C: 405.8349513 V     T = -25 °C: 371.4018295 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:07 CET jreher Updated box and position via API.
03. Feb 2021 18:22:40 CET jreher Updated box and position via API.
07. Oct 2020 12:11:09 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:45 CEST jreher Updated box and position via API.
11. Aug 2020 17:33:41 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:49 CET jreher Updated APD location via API.
25. Nov 2019 17:16:17 CET jreher Updated box and position via API.
05. Aug 2019 16:55:00 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 13:58:54 CEST markus.moritz
08. Jul 2019 14:52:13 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:20 CEST jreher Updated APD location via API.
01. Jul 2019 12:41:22 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:13:03 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:27 CEST Tobias Imported from Hamamatsu datasheet.