RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2520029060 - Archived data from Tue, 11. August 2020 17:33:40 CEST


This is all the information about APD 2520029060. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2520029060
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2520029060/0819008702
Unit: #1178 (barcode 1309012978)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: G07
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.9 V
Dark current: 10 nA
   
Screening Logistics:  
Available: No
Storage Box: 68
Position in Box: 17
EP1 batch: 48
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.4591098 V     T = -25 °C: 343.3465799 V
Voltage for Gain 150: T = +20 °C: 386.2508585 V     T = -25 °C: 350.6834488 V
Voltage for Gain 200: T = +20 °C: 390.5862212 V     T = -25 °C: 354.8017717 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.492693234 V-1     T = -25 °C: 4.820210678 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.777686854 V-1     T = -25 °C: 9.813978407 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.2589715 V-1     T = -25 °C: 15.5219476 V-1
Break-through voltage: T = +20 °C: 405.8567353 V     T = -25 °C: 369.8329717 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:06 CET jreher Updated box and position via API.
03. Feb 2021 18:22:39 CET jreher Updated box and position via API.
11. Aug 2020 17:33:40 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:01:57 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:26 CET jreher Updated box and position via API.
27. Nov 2019 19:40:49 CET jreher Updated APD location via API.
25. Nov 2019 17:16:16 CET jreher Updated box and position via API.
05. Aug 2019 16:54:51 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 13:56:57 CEST markus.moritz
08. Jul 2019 14:52:12 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:20 CEST jreher Updated APD location via API.
01. Jul 2019 12:41:22 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:13:03 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:25 CEST Tobias Imported from Hamamatsu datasheet.