RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2520029055 - Archived data from Wed, 03. February 2021 18:22:39 CET


This is all the information about APD 2520029055. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2520029055
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2520029055/2314025333
Unit: #1685 (barcode 1309017690)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.6 V
Dark current: 5.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 68
Position in Box: 12
EP1 batch: 47
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.5705024 V     T = -25 °C: 344.999228 V
Voltage for Gain 150: T = +20 °C: 388.3222463 V     T = -25 °C: 352.3311517 V
Voltage for Gain 200: T = +20 °C: 392.6258 V     T = -25 °C: 356.4579005 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.469217802 V-1     T = -25 °C: 4.948773343 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.801075854 V-1     T = -25 °C: 9.240735565 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.3918537 V-1     T = -25 °C: 16.46396025 V-1
Break-through voltage: T = +20 °C: 407.4310557 V     T = -25 °C: 371.1294057 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:06 CET jreher Updated box and position via API.
03. Feb 2021 18:22:39 CET jreher Updated box and position via API.
29. Jan 2021 10:27:02 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:31 CEST jreher Updated box and position via API.
11. Aug 2020 17:33:39 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:48 CET jreher Updated APD location via API.
25. Nov 2019 17:16:16 CET jreher Updated box and position via API.
05. Aug 2019 16:54:50 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 13:54:13 CEST markus.moritz
05. Jul 2019 13:45:19 CEST jreher Updated APD location via API.
01. Jul 2019 12:46:00 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:13:03 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:22 CEST Tobias Imported from Hamamatsu datasheet.