RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2519029036 - Archived data from Wed, 03. February 2021 18:22:38 CET


This is all the information about APD 2519029036. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2519029036
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.7 V
Dark current: 3.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 68
Position in Box: 3
EP1 batch: 47
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.8376444 V     T = -25 °C: 341.9930395 V
Voltage for Gain 150: T = +20 °C: 384.5704264 V     T = -25 °C: 349.2646829 V
Voltage for Gain 200: T = +20 °C: 388.8813236 V     T = -25 °C: 353.352317 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.778306889 V-1     T = -25 °C: 5.048662623 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.661009463 V-1     T = -25 °C: 9.470463714 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.15203976 V-1     T = -25 °C: 15.03316626 V-1
Break-through voltage: T = +20 °C: 404.1606045 V     T = -25 °C: 368.3311777 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:05 CET jreher Updated box and position via API.
03. Feb 2021 18:22:38 CET jreher Updated box and position via API.
11. Aug 2020 17:33:38 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:48 CET jreher Updated APD location via API.
25. Nov 2019 17:16:15 CET jreher Updated box and position via API.
05. Aug 2019 16:54:50 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 13:50:26 CEST markus.moritz
05. Jul 2019 13:45:19 CEST jreher Updated APD location via API.
01. Jul 2019 12:46:00 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:13:03 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:00:19 CEST Tobias Imported from Hamamatsu datasheet.