Show Hamamatsu Avalanche Photo Diode 2410026695 - Archived data from Fri, 12. January 2018 13:16:57 CET


This is all the information about APD 2410026695. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2410026695
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.2 V
Dark current: 7.4E-9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 14
Position in Box: 50
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:36 CET jreher Updated box and position via API.
03. Feb 2021 18:15:46 CET jreher Updated box and position via API.
11. Aug 2020 17:22:08 CEST jreher Updated APD characteristics via API.
28. Nov 2019 10:39:11 CET jreher Updated APD location via API.
25. Nov 2019 17:12:01 CET jreher Updated box and position via API.
13. Jun 2019 14:19:17 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:30 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:25 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:43 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:13:02 CET Tobias Corrected dark current unit.
13. Dec 2018 11:54:46 CET markus.moritz
23. Nov 2018 14:21:11 CET markus.moritz
12. Jan 2018 13:16:57 CET Tobias Imported from Hamamatsu datasheet.