RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2410026693 - Archived data from Mon, 26. April 2021 15:23:01 CEST


This is all the information about APD 2410026693. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2410026693
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 378.9 V
Dark current: 5.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 174
Position in Box: 50
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.2746372 V     T = -25 °C: 344.1094926 V
Voltage for Gain 150: T = +20 °C: 387.095894 V     T = -25 °C: 351.4429917 V
Voltage for Gain 200: T = +20 °C: 391.4317876 V     T = -25 °C: 355.550765 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.532955826 V-1     T = -25 °C: 4.915596323 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.686408829 V-1     T = -25 °C: 9.157612081 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.10857138 V-1     T = -25 °C: 15.91659468 V-1
Break-through voltage: T = +20 °C: 407.0152882 V     T = -25 °C: 370.7320814 V
   
Notes: foam


Version history

Time Author Change comment
26. Oct 2021 09:59:27 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:00:12 CEST oafedulidis Updated box and position via API.
26. Apr 2021 15:23:01 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:49:36 CET jreher Updated box and position via API.
03. Feb 2021 18:15:46 CET jreher Updated box and position via API.
11. Aug 2020 17:22:07 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:55 CET jreher Updated APD location via API.
25. Nov 2019 17:12:01 CET jreher Updated box and position via API.
04. Jul 2019 11:08:08 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:30 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:25 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:43 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:13:02 CET Tobias Corrected dark current unit.
26. Nov 2018 12:24:17 CET markus.moritz
16. Nov 2018 12:22:57 CET markus.moritz
12. Jan 2018 13:16:57 CET Tobias Imported from Hamamatsu datasheet.