RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2410026668 - Archived data from Fri, 05. February 2021 10:49:33 CET


This is all the information about APD 2410026668. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2410026668
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E11
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.2 V
Dark current: 7.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 14
Position in Box: 24
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.3121411 V     T = -25 °C: 349.4186257 V
Voltage for Gain 150: T = +20 °C: 393.1857828 V     T = -25 °C: 356.9113651 V
Voltage for Gain 200: T = +20 °C: 397.5693444 V     T = -25 °C: 361.1083614 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.40108228 V-1     T = -25 °C: 4.951269407 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.205471285 V-1     T = -25 °C: 8.952386815 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.0700832 V-1     T = -25 °C: 15.42972954 V-1
Break-through voltage: T = +20 °C: 412.7078104 V     T = -25 °C: 376.206821 V
   
Notes: foam


Version history

Time Author Change comment
26. Oct 2021 10:34:25 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:24 CEST jreher Updated box and position via API.
05. Feb 2021 10:49:33 CET jreher Updated box and position via API.
03. Feb 2021 18:15:43 CET jreher Updated box and position via API.
11. Aug 2020 17:22:03 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:53 CET jreher Updated APD location via API.
25. Nov 2019 17:11:59 CET jreher Updated box and position via API.
04. Jul 2019 11:08:07 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:27 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:22 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:35 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:13:02 CET Tobias Corrected dark current unit.
26. Nov 2018 12:06:57 CET markus.moritz
16. Nov 2018 13:14:49 CET markus.moritz
12. Jan 2018 13:16:56 CET Tobias Imported from Hamamatsu datasheet.