RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2410026666 - Archived data from Wed, 03. February 2021 18:15:43 CET


This is all the information about APD 2410026666. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2410026666
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2317025572/2410026666
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E10
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.2 V
Dark current: 7 nA
   
Screening Logistics:  
Available: No
Storage Box: 14
Position in Box: 22
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.3231409 V     T = -25 °C: 347.6570921 V
Voltage for Gain 150: T = +20 °C: 391.1913773 V     T = -25 °C: 355.1024672 V
Voltage for Gain 200: T = +20 °C: 395.5747511 V     T = -25 °C: 359.2704874 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.422316942 V-1     T = -25 °C: 4.923123423 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.259875102 V-1     T = -25 °C: 8.906942813 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.1259875 V-1     T = -25 °C: 15.36428919 V-1
Break-through voltage: T = +20 °C: 410.5627646 V     T = -25 °C: 374.1227823 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:49:33 CET jreher Updated box and position via API.
03. Feb 2021 18:15:43 CET jreher Updated box and position via API.
11. Aug 2020 17:22:03 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:46:51 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:47 CET jreher Updated box and position via API.
27. Nov 2019 19:31:53 CET jreher Updated APD location via API.
25. Nov 2019 17:11:59 CET jreher Updated box and position via API.
04. Jul 2019 11:08:06 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:27 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:22 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:35 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:13:01 CET Tobias Corrected dark current unit.
26. Nov 2018 12:05:46 CET markus.moritz
16. Nov 2018 13:15:29 CET markus.moritz
12. Jan 2018 13:16:56 CET Tobias Imported from Hamamatsu datasheet.