RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2409026629 - Archived data from Wed, 03. February 2021 18:15:41 CET


This is all the information about APD 2409026629. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2409026629
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 384.6 V
Dark current: 3.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 174
Position in Box: 30
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.4131487 V     T = -25 °C: 348.8725298 V
Voltage for Gain 150: T = +20 °C: 392.3066463 V     T = -25 °C: 356.3393602 V
Voltage for Gain 200: T = +20 °C: 396.7194211 V     T = -25 °C: 360.5896043 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.267351963 V-1     T = -25 °C: 4.838270517 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.584073937 V-1     T = -25 °C: 9.476535117 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.4591354 V-1     T = -25 °C: 14.90359728 V-1
Break-through voltage: T = +20 °C: 411.8543028 V     T = -25 °C: 376.3579636 V
   
Notes: foam


Version history

Time Author Change comment
26. Apr 2021 15:22:59 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:49:31 CET jreher Updated box and position via API.
03. Feb 2021 18:15:41 CET jreher Updated box and position via API.
11. Aug 2020 17:21:59 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:52 CET jreher Updated APD location via API.
25. Nov 2019 17:11:58 CET jreher Updated box and position via API.
04. Jul 2019 11:08:05 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:25 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:20 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:26 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:13:01 CET Tobias Corrected dark current unit.
26. Nov 2018 11:54:46 CET markus.moritz
26. Nov 2018 11:50:24 CET markus.moritz
16. Nov 2018 13:22:01 CET markus.moritz
12. Jan 2018 13:16:56 CET Tobias Imported from Hamamatsu datasheet.