Serial: 2409026623
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2407026441/2409026623
Unit: #853 (barcode 1309009367)
Preamp: 4533
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E05
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 382.2 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 14
Position in Box: 2
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.8413342 V     T = -25 °C: 346.4176287 V
Voltage for Gain 150: T = +20 °C: 389.6908284 V     T = -25 °C: 353.8003314 V
Voltage for Gain 200: T = +20 °C: 394.0861005 V     T = -25 °C: 357.989069 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.315509213 V-1     T = -25 °C: 4.479370157 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.860902316 V-1     T = -25 °C: 9.448257019 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.9833871 V-1     T = -25 °C: 14.67089587 V-1
Break-through voltage: T = +20 °C: 409.6394192 V     T = -25 °C: 373.0950971 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:49:31 CET jreher Updated box and position via API.
03. Feb 2021 18:15:40 CET jreher Updated box and position via API.
11. Aug 2020 17:21:59 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:42:50 CET jreher Updated box and position via API.
27. Nov 2019 19:31:51 CET jreher Updated APD location via API.
25. Nov 2019 17:11:58 CET jreher Updated box and position via API.
17. Oct 2019 14:02:30 CEST tholtmann Assigned to unit by script
17. Oct 2019 13:38:27 CEST tholtmann Assigned to capsule by script
04. Jul 2019 11:08:05 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:25 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:20 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:26 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:13:01 CET Tobias Corrected dark current unit.
26. Nov 2018 11:54:21 CET markus.moritz
26. Nov 2018 11:48:51 CET markus.moritz
16. Nov 2018 13:22:48 CET markus.moritz
12. Jan 2018 13:16:56 CET Tobias Imported from Hamamatsu datasheet.