RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2409026621 - Archived data from Fri, 16. November 2018 15:21:15 CET


This is all the information about APD 2409026621. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2409026621
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.8 V
Dark current: 5.9E-9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 13
Position in Box: 50
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:29 CET jreher Updated box and position via API.
03. Feb 2021 18:15:38 CET jreher Updated box and position via API.
11. Aug 2020 17:21:58 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:44 CET jreher Updated APD location via API.
25. Nov 2019 17:11:57 CET jreher Updated box and position via API.
04. Jul 2019 11:08:01 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:25 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:20 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:26 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:13:01 CET Tobias Corrected dark current unit.
26. Nov 2018 13:56:07 CET markus.moritz
16. Nov 2018 15:21:15 CET markus.moritz
12. Jan 2018 13:16:56 CET Tobias Imported from Hamamatsu datasheet.