RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2409026609 - Archived data from Mon, 17. August 2020 15:50:35 CEST


This is all the information about APD 2409026609. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2409026609
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E12
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 378.9 V
Dark current: 7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 13
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.0398814 V     T = -25 °C: 343.6455198 V
Voltage for Gain 150: T = +20 °C: 386.8379793 V     T = -25 °C: 350.9995792 V
Voltage for Gain 200: T = +20 °C: 391.1966879 V     T = -25 °C: 355.1452653 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.675128419 V-1     T = -25 °C: 4.662524156 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.973387031 V-1     T = -25 °C: 9.555460562 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.63983566 V-1     T = -25 °C: 14.93213723 V-1
Break-through voltage: T = +20 °C: 406.9162254 V     T = -25 °C: 370.5888472 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:49:27 CET jreher Updated box and position via API.
03. Feb 2021 18:15:37 CET jreher Updated box and position via API.
07. Oct 2020 12:26:23 CEST jreher Assigned to capsule by script
17. Aug 2020 15:50:35 CEST jreher Updated box and position via API.
11. Aug 2020 17:21:56 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:34:54 CET jreher Updated box and position via API.
27. Nov 2019 19:31:43 CET jreher Updated APD location via API.
25. Nov 2019 17:11:56 CET jreher Updated box and position via API.
04. Jul 2019 11:08:00 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:24 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:19 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:25 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:13:00 CET Tobias Corrected dark current unit.
26. Nov 2018 13:31:13 CET markus.moritz
16. Nov 2018 15:24:37 CET markus.moritz
12. Jan 2018 13:16:56 CET Tobias Imported from Hamamatsu datasheet.