RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2409026608 - Archived data from Wed, 03. February 2021 18:15:37 CET


This is all the information about APD 2409026608. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2409026608
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2409026608/2405026261
Unit: #837 (barcode 1309009206)
Preamp: 4535
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D12
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.6 V
Dark current: 7.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 13
Position in Box: 37
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.9833744 V     T = -25 °C: 345.4983369 V
Voltage for Gain 150: T = +20 °C: 388.8254452 V     T = -25 °C: 352.9132379 V
Voltage for Gain 200: T = +20 °C: 393.2110447 V     T = -25 °C: 357.0677849 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.620918881 V-1     T = -25 °C: 4.750036571 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.244919571 V-1     T = -25 °C: 9.389894084 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.58294871 V-1     T = -25 °C: 15.03723167 V-1
Break-through voltage: T = +20 °C: 408.1293642 V     T = -25 °C: 371.7845743 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:49:27 CET jreher Updated box and position via API.
03. Feb 2021 18:15:37 CET jreher Updated box and position via API.
11. Aug 2020 17:21:56 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:42:38 CET jreher Updated box and position via API.
27. Nov 2019 19:31:43 CET jreher Updated APD location via API.
25. Nov 2019 17:11:56 CET jreher Updated box and position via API.
15. Jul 2019 15:42:14 CEST jreher Assigned to unit by script
15. Jul 2019 15:19:01 CEST jreher Assigned to capsule by script
04. Jul 2019 11:07:59 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:24 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:19 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:25 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:13:00 CET Tobias Corrected dark current unit.
26. Nov 2018 13:31:50 CET markus.moritz
16. Nov 2018 15:24:56 CET markus.moritz
12. Jan 2018 13:16:56 CET Tobias Imported from Hamamatsu datasheet.