RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2409026595 - Archived data from Wed, 03. February 2021 18:15:36 CET


This is all the information about APD 2409026595. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2409026595
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2409026595/2420027543
Unit: #865 (barcode 1309009480)
Preamp: 4598
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.3 V
Dark current: 6.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 13
Position in Box: 26
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.9656234 V     T = -25 °C: 344.7769222 V
Voltage for Gain 150: T = +20 °C: 387.7669643 V     T = -25 °C: 352.1874835 V
Voltage for Gain 200: T = +20 °C: 392.1083097 V     T = -25 °C: 356.3656019 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.655168028 V-1     T = -25 °C: 4.826093279 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.268046129 V-1     T = -25 °C: 9.467461134 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.44523589 V-1     T = -25 °C: 14.50206397 V-1
Break-through voltage: T = +20 °C: 407.6974262 V     T = -25 °C: 371.3643812 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:49:26 CET jreher Updated box and position via API.
03. Feb 2021 18:15:36 CET jreher Updated box and position via API.
11. Aug 2020 17:21:54 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:42:52 CET jreher Updated box and position via API.
27. Nov 2019 19:31:42 CET jreher Updated APD location via API.
25. Nov 2019 17:11:55 CET jreher Updated box and position via API.
17. Oct 2019 14:10:42 CEST tholtmann Assigned to unit by script
17. Oct 2019 13:56:57 CEST tholtmann Assigned to capsule by script
04. Jul 2019 11:07:59 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:23 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:18 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:18 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:13:00 CET Tobias Corrected dark current unit.
26. Nov 2018 13:41:46 CET markus.moritz
26. Nov 2018 13:41:34 CET markus.moritz
16. Nov 2018 15:28:26 CET markus.moritz
12. Jan 2018 13:16:55 CET Tobias Imported from Hamamatsu datasheet.