Show Hamamatsu Avalanche Photo Diode 2409026585 - Archived data from Wed, 03. February 2021 18:15:35 CET
This is all the information about APD 2409026585. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2409026585 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | E02 |
Break-through voltage: | 414 V |
Voltage for Gain 100 (T=+25°C): | 386.3 V |
Dark current: | 3.7 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 13 |
Position in Box: | 17 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 12. Nov 2018 |
Sent for analysis after irradiation: | 26. Nov 2018 |
Return for assembly: | none |
Irradiation: | |
Date: | 22. Nov 2018 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 23. Nov 2018 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 386.0294714 V T = -25 °C: 350.4282793 V |
Voltage for Gain 150: | T = +20 °C: 393.90676 V T = -25 °C: 357.9576999 V |
Voltage for Gain 200: | T = +20 °C: 398.2779828 V T = -25 °C: 362.1825366 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.618778837 V-1 T = -25 °C: 4.911481969 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 9.138726099 V-1 T = -25 °C: 8.851699268 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.25231904 V-1 T = -25 °C: 15.02473683 V-1 |
Break-through voltage: | T = +20 °C: 414.272974 V T = -25 °C: 377.802145 V |
Notes: | foam |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 10:49:25 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:15:35 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:21:52 CEST | jreher | Updated APD characteristics via API. |
27. Nov 2019 19:31:41 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:11:54 CET | jreher | Updated box and position via API. |
04. Jul 2019 11:07:58 CEST | jreher | Updated APD location via API. |
12. Jun 2019 16:46:22 CEST | jreher | Updated APD batch assignment via API. |
12. Jun 2019 16:31:17 CEST | jreher | Updated APD batch assignment via API. |
12. Jun 2019 15:03:18 CEST | jreher | Updated APD batch assignment via API. |
03. Jan 2019 00:13:00 CET | Tobias | Corrected dark current unit. |
26. Nov 2018 13:47:19 CET | markus.moritz | |
16. Nov 2018 15:31:42 CET | markus.moritz | |
12. Jan 2018 13:16:55 CET | Tobias | Imported from Hamamatsu datasheet. |