RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2408026550 - Archived data from Tue, 11. August 2020 17:21:49 CEST


This is all the information about APD 2408026550. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2408026550
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A07
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.5 V
Dark current: 5.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 13
Position in Box: 3
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.8032553 V     T = -25 °C: 348.5107607 V
Voltage for Gain 150: T = +20 °C: 391.6405862 V     T = -25 °C: 355.9565132 V
Voltage for Gain 200: T = +20 °C: 396.0663903 V     T = -25 °C: 360.1668839 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.768281628 V-1     T = -25 °C: 4.734012967 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.357555185 V-1     T = -25 °C: 8.86388208 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.68608473 V-1     T = -25 °C: 14.51544582 V-1
Break-through voltage: T = +20 °C: 409.8557125 V     T = -25 °C: 375.3742022 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:49:23 CET jreher Updated box and position via API.
03. Feb 2021 18:15:33 CET jreher Updated box and position via API.
11. Aug 2020 17:21:49 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:40 CET jreher Updated APD location via API.
25. Nov 2019 17:11:53 CET jreher Updated box and position via API.
04. Jul 2019 11:07:57 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:20 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:15 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:10 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:59 CET Tobias Corrected dark current unit.
26. Nov 2018 13:53:44 CET markus.moritz
16. Nov 2018 15:35:27 CET markus.moritz
12. Jan 2018 13:16:55 CET Tobias Imported from Hamamatsu datasheet.