RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2408026537 - Archived data from Wed, 03. February 2021 18:15:29 CET


This is all the information about APD 2408026537. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2408026537
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2408026537/2418027340
Unit: #848 (barcode 1309009312)
Preamp: 4513
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: B08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382.2 V
Dark current: 4.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 12
Position in Box: 40
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.7007534 V     T = -25 °C: 347.2197179 V
Voltage for Gain 150: T = +20 °C: 390.5942993 V     T = -25 °C: 354.6754048 V
Voltage for Gain 200: T = +20 °C: 394.9492446 V     T = -25 °C: 358.8427043 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.665115745 V-1     T = -25 °C: 5.01622416 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.194028937 V-1     T = -25 °C: 9.528870765 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.92993859 V-1     T = -25 °C: 15.38468091 V-1
Break-through voltage: T = +20 °C: 409.5576224 V     T = -25 °C: 373.5177009 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:20 CET jreher Updated box and position via API.
03. Feb 2021 18:15:29 CET jreher Updated box and position via API.
11. Aug 2020 17:21:46 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:42:39 CET jreher Updated box and position via API.
27. Nov 2019 19:31:32 CET jreher Updated APD location via API.
25. Nov 2019 17:11:51 CET jreher Updated box and position via API.
15. Jul 2019 15:51:03 CEST jreher Assigned to unit by script
15. Jul 2019 15:30:30 CEST jreher Assigned to capsule by script
04. Jul 2019 11:07:51 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:19 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:14 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:10 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:59 CET Tobias Corrected dark current unit.
13. Dec 2018 13:54:39 CET markus.moritz
30. Nov 2018 08:36:29 CET markus.moritz
12. Jan 2018 13:16:55 CET Tobias Imported from Hamamatsu datasheet.