RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2408026533 - Archived data from Wed, 03. February 2021 18:15:28 CET


This is all the information about APD 2408026533. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2408026533
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A09
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.5 V
Dark current: 5.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 12
Position in Box: 36
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.8021412 V     T = -25 °C: 351.9706423 V
Voltage for Gain 150: T = +20 °C: 395.7315884 V     T = -25 °C: 359.5014937 V
Voltage for Gain 200: T = +20 °C: 400.13624 V     T = -25 °C: 363.7360147 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.586056301 V-1     T = -25 °C: 4.647439662 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.951934192 V-1     T = -25 °C: 9.451818753 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.16587665 V-1     T = -25 °C: 15.28310611 V-1
Break-through voltage: T = +20 °C: 415.192004 V     T = -25 °C: 379.1273292 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 09:35:25 CET oafedulidis Assigned to capsule by script
10. May 2021 14:01:00 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:49:19 CET jreher Updated box and position via API.
03. Feb 2021 18:15:28 CET jreher Updated box and position via API.
11. Aug 2020 17:21:46 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:32 CET jreher Updated APD location via API.
25. Nov 2019 17:11:51 CET jreher Updated box and position via API.
04. Jul 2019 11:07:51 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:19 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:14 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:09 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:58 CET Tobias Corrected dark current unit.
13. Dec 2018 13:56:19 CET markus.moritz
30. Nov 2018 08:37:56 CET markus.moritz
12. Jan 2018 13:16:55 CET Tobias Imported from Hamamatsu datasheet.