RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2408026532 - Archived data from Wed, 03. February 2021 18:15:28 CET


This is all the information about APD 2408026532. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2408026532
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B09
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.5 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 12
Position in Box: 35
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.1829461 V     T = -25 °C: 349.3051365 V
Voltage for Gain 150: T = +20 °C: 393.080272 V     T = -25 °C: 356.7903098 V
Voltage for Gain 200: T = +20 °C: 397.4428276 V     T = -25 °C: 361.0289834 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.460619428 V-1     T = -25 °C: 4.671750333 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.525631667 V-1     T = -25 °C: 9.209137288 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.72261784 V-1     T = -25 °C: 14.73276583 V-1
Break-through voltage: T = +20 °C: 411.792132 V     T = -25 °C: 375.6247246 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:19 CET jreher Updated box and position via API.
03. Feb 2021 18:15:28 CET jreher Updated box and position via API.
11. Aug 2020 17:21:45 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:32 CET jreher Updated APD location via API.
25. Nov 2019 17:11:51 CET jreher Updated box and position via API.
04. Jul 2019 11:07:51 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:19 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:14 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:09 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:58 CET Tobias Corrected dark current unit.
13. Dec 2018 13:56:37 CET markus.moritz
30. Nov 2018 08:38:18 CET markus.moritz
12. Jan 2018 13:16:55 CET Tobias Imported from Hamamatsu datasheet.