RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2408026530 - Archived data from Tue, 11. August 2020 17:21:45 CEST


This is all the information about APD 2408026530. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2408026530
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2408026530/2805031187
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E03
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 12
Position in Box: 33
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.5261504 V     T = -25 °C: 348.0264119 V
Voltage for Gain 150: T = +20 °C: 391.4060159 V     T = -25 °C: 355.4452962 V
Voltage for Gain 200: T = +20 °C: 395.819314 V     T = -25 °C: 359.5887302 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.404451842 V-1     T = -25 °C: 4.993210215 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.696948134 V-1     T = -25 °C: 8.614340726 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.40521019 V-1     T = -25 °C: 15.29038004 V-1
Break-through voltage: T = +20 °C: 410.9231527 V     T = -25 °C: 374.5961136 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:19 CET jreher Updated box and position via API.
03. Feb 2021 18:15:28 CET jreher Updated box and position via API.
11. Aug 2020 17:21:45 CEST jreher Updated APD characteristics via API.
25. Jun 2020 11:14:25 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:42 CET jreher Updated box and position via API.
27. Nov 2019 19:31:32 CET jreher Updated APD location via API.
25. Nov 2019 17:11:51 CET jreher Updated box and position via API.
04. Jul 2019 11:07:51 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:19 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:14 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:09 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:58 CET Tobias Corrected dark current unit.
13. Dec 2018 13:57:43 CET markus.moritz
30. Nov 2018 08:38:55 CET markus.moritz
12. Jan 2018 13:16:55 CET Tobias Imported from Hamamatsu datasheet.