Show Hamamatsu Avalanche Photo Diode 2407026469 - Archived data from Tue, 11. August 2020 17:21:37 CEST


This is all the information about APD 2407026469. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2407026469
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.8 V
Dark current: 4.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 11
Position in Box: 41
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.8071683 V     T = -25 °C: 346.34489 V
Voltage for Gain 150: T = +20 °C: 389.5535679 V     T = -25 °C: 353.7547579 V
Voltage for Gain 200: T = +20 °C: 393.8758892 V     T = -25 °C: 357.94439 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.994999209 V-1     T = -25 °C: 4.500883729 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.049464158 V-1     T = -25 °C: 10.01358378 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.77638037 V-1     T = -25 °C: 14.00755952 V-1
Break-through voltage: T = +20 °C: 409.4319486 V     T = -25 °C: 373.4591865 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:13 CET jreher Updated box and position via API.
03. Feb 2021 18:15:21 CET jreher Updated box and position via API.
07. Oct 2020 12:09:41 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:20 CEST jreher Updated box and position via API.
11. Aug 2020 17:21:37 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:21 CET jreher Updated APD location via API.
25. Nov 2019 17:11:47 CET jreher Updated box and position via API.
04. Jul 2019 11:07:43 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:15 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:10 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:52 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:57 CET Tobias Corrected dark current unit.
13. Dec 2018 12:08:50 CET markus.moritz
30. Nov 2018 13:24:07 CET markus.moritz
12. Jan 2018 13:16:54 CET Tobias Imported from Hamamatsu datasheet.