RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2407026468 - Archived data from Tue, 16. February 2021 12:28:44 CET


This is all the information about APD 2407026468. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2407026468
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G05
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 384 V
Dark current: 4.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 11
Position in Box: 40
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.1859836 V     T = -25 °C: 347.8467057 V
Voltage for Gain 150: T = +20 °C: 391.0367242 V     T = -25 °C: 355.2320774 V
Voltage for Gain 200: T = +20 °C: 395.4285081 V     T = -25 °C: 359.4551163 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.413067479 V-1     T = -25 °C: 5.088556048 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.846975733 V-1     T = -25 °C: 9.140424349 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 16.01085613 V-1     T = -25 °C: 14.64723254 V-1
Break-through voltage: T = +20 °C: 410.2934608 V     T = -25 °C: 374.5539255 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:03:43 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:44 CET jreher Updated box and position via API.
05. Feb 2021 10:49:12 CET jreher Updated box and position via API.
03. Feb 2021 18:15:21 CET jreher Updated box and position via API.
11. Aug 2020 17:21:37 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:21 CET jreher Updated APD location via API.
25. Nov 2019 17:11:47 CET jreher Updated box and position via API.
04. Jul 2019 11:07:43 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:15 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:09 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:52 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:57 CET Tobias Corrected dark current unit.
13. Dec 2018 12:23:27 CET markus.moritz
30. Nov 2018 13:28:43 CET markus.moritz
12. Jan 2018 13:16:54 CET Tobias Imported from Hamamatsu datasheet.