RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2407026465 - Archived data from Tue, 11. August 2020 17:21:36 CEST


This is all the information about APD 2407026465. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2407026465
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2403026135/2407026465
Unit: #844 (barcode 1309009275)
Preamp: 4420
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.3 V
Dark current: 6.1 nA
   
Screening Logistics:  
Available: No
Storage Box: 11
Position in Box: 37
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.665327 V     T = -25 °C: 347.2440236 V
Voltage for Gain 150: T = +20 °C: 390.5544706 V     T = -25 °C: 354.6970082 V
Voltage for Gain 200: T = +20 °C: 394.9104083 V     T = -25 °C: 358.8519366 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.410997833 V-1     T = -25 °C: 4.407284821 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.326384187 V-1     T = -25 °C: 9.779249022 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.21545544 V-1     T = -25 °C: 15.12332562 V-1
Break-through voltage: T = +20 °C: 410.5108354 V     T = -25 °C: 374.2192669 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:12 CET jreher Updated box and position via API.
03. Feb 2021 18:15:20 CET jreher Updated box and position via API.
11. Aug 2020 17:21:36 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:42:39 CET jreher Updated box and position via API.
27. Nov 2019 19:31:21 CET jreher Updated APD location via API.
25. Nov 2019 17:11:46 CET jreher Updated box and position via API.
15. Jul 2019 15:47:53 CEST jreher Assigned to unit by script
15. Jul 2019 15:25:33 CEST jreher Assigned to capsule by script
04. Jul 2019 11:07:43 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:14 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:09 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:52 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:57 CET Tobias Corrected dark current unit.
13. Dec 2018 12:27:36 CET markus.moritz
30. Nov 2018 13:30:18 CET markus.moritz
12. Jan 2018 13:16:54 CET Tobias Imported from Hamamatsu datasheet.